what is changing risk​

Respuesta :

pompomsquad33 pompomsquad33
  • 02-03-2022

Answer:

here:

Explanation:

A change risk is the probability that a change program will not reach its stated objectives and goals. There is a wide range of factors that will increase the change risk for a project, and so it is important to conduct an effective risk change assessment to understand, document, and reduce these change risks.

Answer Link

Otras preguntas

What is the answer to m
How did Asoka work to spread Buddhism?
These terms can be used to generalize the human geography of the region. Select all that apply. Arab English Hindu Islam monotheistic multiethnic Muslim religio
what are 2 lasting impacts of the civil war
Find the slope of the line passing through the points (-1,3) and (4,-7
Helppppp plz 10points
What forms When animal cells are almost finished dividing during telophase and is the point where they will split
simplify (b^5)^2 APEX LEARNING
What is the value for y? Enter your answer in the box. y = An isosceles triangle A B C with horizontal base B C and vertex A is above the base. Side A C a
1. Rafael no ____________ muy grande. (1 point) era fue 2. ___________ nublado ayer. (1 point) Estaba Estuvo 3. Nosotros _____________ a las diez en punto. (1 p