A construction company needs to remove 2 1/6 tons of dirt from a construction site. They can remove 7/8 tons of dirt each hour. What is the total number of hours it will take to remove the dirt?

Respuesta :

jupjupjupjup202 jupjupjupjup202
  • 04-05-2018
The answer is 4.

Hope I helped :)
Answer Link

Otras preguntas

What is being personified in the following passage? Fear had settled over the city.
3. Identify the adjective phrase in the sentence. What sort of food do crickets usually eat? (Points : 2) usually eat do crickets of
Is 4xy + 2y = 9 linear ? If yes write the equation in standard form & determine the x & y interests
A basketball rolls of a 0.70 m high desk and strikes the floor 0.25 m away from the base of the desk? How fast was the ball rolling?
write the rate 1/7 inch ----------------- as a unit rate 1/14 minute
Why is India considered a subcontinent
why do living things need nitrogen?
Trent and Chris are musicians, and they recently played a concert for 20,000 fans. The rectangular venue measured 87 yards by 57 yards. What was the approximate
how can temperature can affect communication?
Samuel used 1/5 of an ounce of butter to make 1/15 of a pound of jelly. How many ounces of butter are needed to make a pound of jelly.