sí 8 trabajadores tardan 5 días en hacer una obra, cuánto tardarán si son 16 trabajadores, Y si son 4 trabajadores. proporcionalidad

Respuesta :

amendocrr amendocrr
  • 14-04-2018
si son 16 trabajadores serian 10 días porque 8 es la mitad de 16 y si fueran 4 trabajadores seria 2.5 días 

Answer Link

Otras preguntas

a plane intersects a prism parallel to the base of the prism. the cross section is a polygon with eight sides. The base of the prism had how many sides
First right answer gets brain
During an effusion experiment, oxygen gas passed through a tiny hole 2.5 times faster than the same number of moles of another gas under the same conditions.
70 decreased by twice a number Use The variable n to represent the unknown number
1. Identify the number of independent and subordinate clauses in the following group of words. Early bicycles had one very large wheel and one very small wheel
61702 67102 same or different?
. In the divisions of the geologic time scale, the largest units are eons, which are divided into eras. Eras are then divided into _____. centuries epochs perio
In To Kill A Mockingbird How does racial injustice affect the outcome of the Tom Robinson trial? Are there any members of the town that want to disregard r
4 students equally share 3/4 of a pizza. How much of the pizza does each student get?
What is the volume of the cone