cristianmart29 cristianmart29
  • 04-04-2018
  • Computers and Technology
contestada

What action is often necessary when installing joists for a cantilever floor?

Respuesta :

idegollacion20
idegollacion20 idegollacion20
  • 14-04-2018
A cantilevered floor is a kind of floor that pops out past the foundation wall below.  Start the joist layout from the longest and strongest run the house or building has. You should also lay floor joists on the stairway's opposing side. Also, remember the 2/3 rule for framing cantilever joists. This means that twice the joist's length should remain inside the structure while the rest sticks out.
Answer Link

Otras preguntas

What is the measure of ZC 42 48 90 180
Which of the following groups of words do not belong? A de la tarde B tomar apuntes C son las dos y media D el horario
Choose the expression that is equivalent to the expression shown below. 4+4+4+4 n 4 + n 4 + n 4 + n 4 n 14 1 4 n 4 4 n 0 0
Please help me with this one too
Complete the sentence using one of the following words:ribosomes,lysosome, or vacuoles Rough ER is rough because it is studded with ;blank
What are the values of x and y? when 36 and 20 are given
Ron is collecting tickets for a school play and needs to determine how many people are attending the show. Several groups give him envelopes with tickets for th
What is the equivalent ratio of 9:3 ?
Please write a narrative essay on earthquakes. I'm lazy and don't want to. No links please.
dom's monthly elctricty bill is £33. how much does he spend on electricity each year