Beverly7520 Beverly7520
  • 01-03-2018
  • Social Studies
contestada

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

a. True

b. False

Respuesta :

Grace0424
Grace0424 Grace0424
  • 01-03-2018
I thinks the answer is true
Answer Link

Otras preguntas

Ingress & Egress Reading Quiz QUESTION 5 of 10: The rate of flow is called a) Input b) Output c) Throughput Od) Through rate Submit Help
can I do all your homework for you?
división de 1322÷29.​
Explain the NAture Vs. Nurture Argument. In your analysis you must include the ideas of instincts, drives, and tabula rasa
Hypothesis: The angle of incidence affects the angle of reflection Independent variable: Dependent variable Control variables:
MULTIPLE CHOICE The coordinates of A and B on a number line are -7 and 9. The coordinates of C and D on a number line are -4 and 12. Are AB and CD congruent? I
show the expression x^2 -1x - 6 in factored form and explain what the solution would mean for the equation. Show your work, please.
50 points! Please help! show your work :D
A rectangle has a perimeter of 24m and an area of 35 m2. If the length and width are each increased by 1m, what will be the area of the new rectangle
write a article on famous places in UAE​