A contractors crew can frame 3 houses in a week. How long will it take them to frame 54 houses if they frame the same number each week?

Respuesta :

nmatiska nmatiska
  • 15-12-2015
This equates to the division problem 54/3, which is equal to 18.
It would take them 18 weeks to frame all 54 houses.
Answer Link
Rainbowcloudycupcake
Rainbowcloudycupcake Rainbowcloudycupcake
  • 15-12-2015
18 weeks to frame 54 houses hope that helps
Answer Link

Otras preguntas

A triangle has a side length of 19inches and a perimeter of 95inches. A similar triangle has a corresponding side length of 20inches. Find the perimeter of the
similarities between social problems and social evil. ​
Which sentence is written using formal language?
X^3+9X^2–25X–33=0 Find The root of X??
Donde existe mayor cantidad de recursos hídricos en el perú​
Jada is 3 feet 11 inches tall. A giraffe at the zoo is 16 feet 10 inches tall. How much taller is the giraffe than Jada? What’s the answer?
HELP ME PLEASE!!ACTUALLY ANSWER IT!!
help..................​
Cost price = 40Selling Price = 52Calculate the percentage profit or loss.Please include explanation!​
(p^2 )^5 find the product