if structural steel installed in 2.75 floors of a building 2 3/8 day , how long will it take to install steel in 11 floors

Respuesta :

gentlebiker
gentlebiker gentlebiker
  • 01-08-2017
I will take 9.5 days, to install steel in 11 floors.
Answer Link

Otras preguntas

Negative ten is no less than two times a number plus fourteen.
Which of the following is an example of figurative language 1.fly:to glide through the air2.fly:to die and go to heaven3.fly: an insect.
A 188 W motor will lift a load at a rate of 0.065 m/s. How heavy of a load can the motor lift at this rate?
Tom swam at one pool each of 5 days during one week. The number of people at the pool when he arrived on each of the days were: 12, 19, 17, 26, 26. What is the
Please help me picture below ! No links
What is the significance of a global mean=53?​
plzzz help will mark the brainliest!!
Solve the linear inequality: x ≤ -x + 4
myths. I don't understand them at all​
Which of the following would be least likely to damage an ecosystem? Question 3 options: 1) founding a new city and building houses there 2) building a dam t