josephmarvens2787 josephmarvens2787
  • 04-03-2022
  • Biology
contestada

When was the keystone pipeline scheduled to be completed.

Respuesta :

Аноним Аноним
  • 04-03-2022

Answer:

2021 - 2022, but the truth is it never got completed.

Answer Link

Otras preguntas

State the domain and range for the function
What is the first step necessary to begin setting up a website once a host has been selected and paid? A) select a domain name B) configure email addresses C) u
what is the graph of the solution to the following compound inequality?
Any help? I'm kinda stuck, if u answer tysm. Highly appreciated.​
The weights of nine different cats in pounds were used to create the box plot above. Which of the following is the interquartile range of the set of weights?
As with many individuals with senile dementia, alois has begun to experience a reduced and distorted sense of self. this is an example of
why does fossil fuel use in the United States make the u.s. vunerable to the political wishes of foreign countries?a. the US is a net exporter of fossil fuelsb.
Which of the following skills and attitudes are provided by socialization? self-control, computer skills, self image, basic discipline, needlepoint, knowledg
A standard deck of playing cards has 52 cards total that contains 13 of each suit (hearts, diamonds, clubs and spades). What is the probability that the card yo
if I have an assignment that is giving 48 points and I only get 29 what percentage is that