ambikathapa2010 ambikathapa2010
  • 12-02-2022
  • Mathematics
contestada

sanaya can do 1/3 part of a work in 1 day and chahanaa can do1/4 part of the same work in 1 day .How much work would they do working together​

Respuesta :

nyajahdonawa811 nyajahdonawa811
  • 12-02-2022

Answer: 36/5= 7.2 days to complete sanaya work day

Step-by-step explanation:

Answer Link

Otras preguntas

what does atomic mass mean
A store pays $3for a magazine.The mark up price is 5%
Match the measurement with the variable. (Notice the words “West” and “up.” Why are these important?) 1. ______30m/s, West A. Distance 2. ______ 25 m, up
What might a person's reading preferences reveal about him or her?
A rectangular plot of land is represented on a coordinate plane where each unit is one foot. The vertices are at (50,20), (50,90), (100,20) and (100,90). What i
What will happen if we didn’t have chemical energy your body
The image shows the construction of two tangent lines from a point outside the circle to the circle. Given that drawing the tangent lines JP and KP is step 5 in
The variables x and y vary directly. Use the values to find the constant of proportionality, . Then write an equation that relates. . Write any fractions in si
"The House of Representatives shall chuse (sic) their Speaker and other Officers; and shall have the sole Power of Impeachment." - from Article I, Section 2 of
Consider the following incomplete deposit ticket: How much cash did Liz receive? Please select the best answer from the choices provided $458.57 $670.71 $323.54