bell041
bell041 bell041
  • 16-01-2017
  • Mathematics
contestada

A construction crew is extending a highway sound barrier that is 13 miles long. The crew builds 1/2 mile per week. Write an equation for the length y(in miles) of the barrier after x weeks.

Respuesta :

heatherway heatherway
  • 16-01-2017
Give me just a min. Let me write it out first.
Answer Link

Otras preguntas

what multiplies to -140 and adds to -31
Side a of a triangle is 4 cm longer than side b. Side c is twice as long as side b. What is the length of each side if the perimeter is 28 cm? Draw and label
How were the independence movements in Vietnam and Kenya similar? Both nations achieved independence from British rule. Both movements involved violent conflict
If x = –1 and y = 2, what is the value of the expression 2x3 – 3xy ?
Why were the Palmer Raids seen as a violation against civil liberties?
The Emergency Highway Energy Conservation Act was passed in 1974. Under this act, states would only get federal highway funding if they set a speed limit of 55
3/8 divided by 1/2 =
what is 24/100 in its simplest form
what is 78% of 50 questions
Explain how heat is transferred inside the earth through convection currents