elizabethmorladza
elizabethmorladza elizabethmorladza
  • 01-09-2021
  • Mathematics
contestada

A piece of work takes 20 labourers to complete in 10 days. how many labourers will complete the same job in 25 days if they work at the same rate?​

Respuesta :

denimjackets23
denimjackets23 denimjackets23
  • 04-09-2021

Step-by-step explanation:

If 20 labourers=10 days

x labourers = 25 days

10x= 25×20

[tex] \frac{10x}{10} = \frac{25 \times 20}{10}[/tex]

Cancelling out by 10 on both sides

[tex]x = \frac{25 \times 2}{1} \\ x = 50 [/tex]

Therefore, it takes 50 labourers to complete the work at the same rate in 25 days.

Answer Link

Otras preguntas

Math problem solving 9-3 A new car costs$13,000and is depreciating by $900each year.how much will the car be worth after 4 years?
Imagine you are hosting a dinner party. Using a demonstrative adjective in each sentence, tell who five different items belong to. Example: Esta bebida es de
The sum of three different numbers is 18. If every number is a prime number, what are the three numbers?
Explain how you do 140 divided by 7/8 plz
Use Constitutional Convention in a sentence to show you understand what it means.
What is 2/3 of a share of $24 390
a pond is 0.03 meters thick.if the pond were 10 times thick how many meters thick would the ice be?
what factors contribute to global winds?
Find the measure of the third side of the triangle given the measures of two sides. 6ft and 19ft I don't know how to get the third side.
How do you solve for t this equation? 1/3t=7