20 men take 10 days to complete a piece of work. find the time taken by 8 men to complete the same piece of work

Respuesta :

michaelpuen12 michaelpuen12
  • 14-06-2021
For the 8 men to finish the work it would take 16.76 days to finish the piece of work
Answer Link

Otras preguntas

If a person earns $19,850 per year , estimate that persons hourly salary ..please give me details and how you rounded
why does salt separated from a salt water solution look different than the salt that dissolved in the water
rounding 672,831 to the tens place? hundreds place? thousand place? ten thousand place? and hundred thousands place?
2(u+3v)=w-5u, what is u in terms of v and w
In the Sumerian civilization, the purpose of a ziggurat was to
What is determined by motion and the spacing of particles?
Estimate the total weight of two boxes that weigh 9.4 and 62.6 pounds using rounding and compatible numbers. which estimate is closer to the actual total weight
22/100 in simplest form?
A 1/4 turn clockwise
Write an equation to model each situation thee solve ! The tallest player on the basketball team is 77 3/4 in. Tall. This is 9 1/2 in. Taller than the shortes