razz25
razz25 razz25
  • 03-05-2021
  • Mathematics
contestada

ramesh can complete a piece of work in 10 days he worked for 4 days and left. if dinesh complete the remaining part of the work ,how much work was done by dinesh​

Respuesta :

rylaneckst rylaneckst
  • 05-05-2021

Answer:

100% of the work was done by him

Answer Link

Otras preguntas

what is the answer to this question the hikers want to share their water evenly so that each member has the same amount. how much water dies each hiker recieve
Which political party did Tammany hall support ?
Write a real world problem that can be solved using the equation, 5x = 3x + 20
Which line represents the direct variation equation y = 1/2 x? line a line b line c line d
How did the Constitution overcome the weaknesses of the Articles of Confederation?
What is an essential step in closely reading fiction?
Explain how you can round 25.691 to the greatest place
Chin bought 12 pounds of apples for $6 use the ratio table to find the cost of buying 3 pounds of apples
what happens if the president wins the popular vote and lost the electoral vote?
Why was New Jersey at one point divided into two separate colonies?