kanika07bts
kanika07bts kanika07bts
  • 01-03-2021
  • Mathematics
contestada

if 5 workers can build 5 cars in 5 days how many days would it take for 7 workers to build 7 cars

Respuesta :

1uk846 1uk846
  • 01-03-2021

Answer:

7 days

Step-by-step explanation:

It would also take 7 days

Answer Link

Otras preguntas

what is the difference of three numbers times a number and half the number 60?
20 PONITS Research the technology of the 1920s (using key words "timeline of 1900s" or "timeline of technology of the 20th century"). Make a timeline with
how to write 15,409 in two forms
Round 36,993 to the nearest thousands
Energy in an ecosystem flows directly from _______.
Simplify 252 over 288
Adverbs can modify all of the following except A)Verbs B)Adjectives C)other Adverbs D) Nouns
what is the percentage of 18/20
what is 6 more than 7 times a number is 41
I am a 2 dimensional shape that has four sides. I have four 90 degree angles. I have two sets of parallel lines. I also have two sides that are one length, and