What is the preferred approach to risk mitigation?

-Tolerate
-Transfer
-Terminate
-Treat

Respuesta :

oeerivona oeerivona
  • 08-01-2021

Answer:

The correct option is;

Terminate

Explanation:

Termination of the risk is equivalent to elimination of the risk by avoiding the activity that brings about the risk or by using a different process that does not include the risk observed in the previous process option

When the reward far outweigh the risk, it may be decided to terminate or eliminate the risk and miss the reward and also terminate the likelihood of the losses to be incurred.

Answer Link

Otras preguntas

PLEASE HELP What units do we use to measure the size of atoms? A. AMU B. Angstrom C. Millimeter D. Nanometer
Identify a transformation of the function ƒ(x) = x by observing the equation of the function g(x) = m ⋅ x, with m > 1
What is a serious bone infection that may result from a compound fracture and become chronic later?
do you need to have good grades to be a child actor?
Which should be done when gathering an exemplar (the sample taken from a suspect)? Choose ALL answers that are correct. 1. Dictate the text of the questioned do
What was the name of the japanese commander in chief who planed the pearl jarbor attack?
Competition increases as _____. temperature decreases population density increases water and light increases number of producers increases
(20 points) answer need ASAP:”)
what is the main idea behind the theory of mercantilism
What does ctto mean?