Six workers can plaster the exterior of a building in 5 hours. If the job is to be completed in only 3 hours 45 minutes, how many workers will be needed?​

Respuesta :

ecamarda ecamarda
  • 03-11-2020

Answer:

Step-by-step explanation:

each worker works 50 min so if you only need 225 min thrn you will need 4.5 workers

Answer Link

Otras preguntas

explain in steps how to graph this linear inequality 2x+3y > -2
What's the other term for: explosive or changing very quickly
Liz wants to drink 1.5 litres of water each day. She buys the water in packs of 6 bottles. Each bottle contains 0.5 litres of water. How many packs of water do
explain why the motion of a body which is moving with constant speed in a circular path is said to be accelerated ?
What is the answer to 12-2x6+2/2
write in decimal form fourteen and eighty-Four hundredths
What's the other term for: one who overindulges in food and drink
example of onomatopoeia in the seven ages of man
What's the other term for: explosive or changing very quickly
If 2/5 of a number is added to 1/3 of the same number ,the sum is 22. What is the number?