gamommy05 gamommy05
  • 14-09-2020
  • Computers and Technology
contestada

which of the following is another term for a variable, such as cost or schedule, that limits the freedom of design, development, or manufacture of a product?

Respuesta :

hungryroad005 hungryroad005
  • 24-09-2020

Answer:

constraint

Explanation:

Answer Link

Otras preguntas

If points​ C, D, and E are on a line and CD20 and CE​32, what are the possible values of​ DE?
the sum of the angle measures of a quadrilateral is 360. Write and solve an equation to find the value of x
A person shops differently when the line at the checkout is long. this is due to ________.
The presence of many c-c and c-h bonds causes fats to be? (a) rich in energy. (b) insoluble in water. (c) low in energy. both (a) and (b). both (b) and (c).
What is the rate of change between (-8,- 8) and (0,8)
The overinfluence of either the parent or the child ego state, causing the adult ego state to lose the ability to mediate internal conflicts, is referred to as
This quote by Sergei Rachmaninoff --"They have not the capacity to make their works exalt-- they meditate, protest, analyze, reason, calculate and brood, but th
What variety of challenges did the Pilgrims face when they arrived in the New World?
Quote response: very little is needed to make a happy life. marcus aurelius do you agree? what do you need to be happy? are we too materialistic? explain your a
Social movements such as black lives matter best exemplify which model of democracy?