subedideepak40 subedideepak40
  • 13-09-2020
  • Mathematics
contestada

5. A can do a piece of work in 8 days which B alone can
do in 10 days. In how many days both working
together can do it?​

Respuesta :

lifelongknowledge62 lifelongknowledge62
  • 13-09-2020

Answer:

In 1 day A can do 1/8 work

In 1 day A can do 1/10 work

in 1 day A+B can do (1/8 +1/10) 40rk

in 1 day A=B can do 9/40 work

so In 1/ (9/40) days A+B can do work together = 40/9 days

Step-by-step explanation:

Answer Link

Otras preguntas

The running time for movie A is 33 mins more than twice the running time for movie B. If the running time for movie A is subtracted from triple the running time
An object that is dropped straight down from a height of 100 m has a vertical change in position that is less than that of an identical object thrown horizontal
The height of a door is 210 cm. Darren is 5/6 of the height of the door. What is Darren’s height?
eric has been donating books he no longer needs to his local library. after 3 months of donating, he had 157 books left in his room. after 8 months of donating,
Is the following correspondence a function? Yes or No?
The height of a door is 210 cm. Darren is 5/6 of the height of the door. What is Darren’s height?
name five states formed from thd old northwest territory
Last one for the day :)Find the slope of the line
what happens when red lead oxide is heated?
simplify sin(3x+13)=cos(4x)