hghgvccom hghgvccom
  • 11-09-2020
  • Business
contestada

The Three Common Constraints on a Project are Scope, Budget and Time.
Ο Τ.
T True
O F.
False

Respuesta :

mjamesbond2016
mjamesbond2016 mjamesbond2016
  • 11-09-2020

Answer:

true

Explanation:

Scope, budget and time are part of the triple constraint theory aka the Iron triangle in management

Answer Link

Otras preguntas

I need help with this!
What can you conclude about Ian's role at school? He is a bully. He is a model student. He is a friend to everyone. He is a teacher's pet.
What are the different types of sensory receptors labeled in the diagram below?
The chart above shows how a star's temperature relates to its color. Rigel is a blue star, Betelgeuse is a red star, and the Sun is a yellow star. How do the te
HELPPPPP PLZ TYSM!!!!!!!!!!!
How long did it take general himmler to put down the uprising in the warsaw ghetto?
Which music style is least likely to be embellished by the performer? A. Fugue B. Aria C. Solo Sonata D. Prelude
What electron current is driven through a 2.3-mm-diameter iron wire by a 0.063 v/m electric field?
A somatic cell spends approximately ________% of the its lifespan in Interphase (I) & only ________ % actively dividing via mitosis (M)
n the 1760s, American colonists responded to Parliament’s taxes in several ways. Which way was most effective?