jeevenjoji2007
jeevenjoji2007 jeevenjoji2007
  • 01-09-2020
  • Mathematics
contestada

if 12 people can finish a job by 5 days how many days will be required finish the same job by 10 people

Respuesta :

ishashunnny
ishashunnny ishashunnny
  • 01-09-2020

Answer:

4

Step-by-step explanation:

12p=5d

1p=5/12

10p=4.1666

≈4 days

Answer Link

Otras preguntas

write a quadratic function whose graph has the given characteristicsvertex: (1,2)Point: (3,6)
5. List all of the factors of 24.O1, 2, 4, 6, 8, 121,2,3,4,61, 2, 3, 4, 6, 8, 12, 2424, 48, 72, 96, 192I need to learn this.
What is an equation for each translation of y=|x|?1. 4 units up2. 7 units down
I have to click and drag like terms onto each other to simplify the problem fully.
divide 406 by -14 A) -29B) -34C) 34D) 44
i need help with my homewrok PLEASE CHECK WORK number 9
Which of the four characteristics ofpopulations is the summary of the amount ofindividuals at each age?A. Growth RateB. Age StructureC. Population DensityD. Age
The Russell family and the Wright family each used their sprinklers last summer. The Russell family's sprinkler was used for 25 hours. The Wright family's sprin
What is the slope of a line perpendicular to the line whose equation is2x + 10y = 20. Fully simplify your answer.
Here is a linear equation: y=1/4x+5/41. Are (1, 1.5) and (12,4) solutions to the equation?A. Both (1, 1.5) and (12,4) are solutions to the equation.B. Neither