Nique9953 Nique9953
  • 04-06-2020
  • Business
contestada

Project managers may be business analysts.
True
False​

Respuesta :

brianguedes23 brianguedes23
  • 04-06-2020

Answer:

True :)

hope it helps :)

Answer Link
evwing
evwing evwing
  • 04-12-2020

Answer:

Ture

Explanation:

Hope this help you

Answer Link

Otras preguntas

How to calculate 100MB at 56 Kbps to transfer time?
how to solve 0.01x+0.07y=0.22 and 0.03x-0.05y=0.14 by substitution
what is the 7.5x10 exponent 5 of scientific notation
Stan works on an assembly line. What effective and appropriate approach would he be wise to use when coping with minor frustrations like hang-ups on a conveyor
David bought a game on sale for $6 less than half its original price.she paid $88 for the jacket. What was the original price
David bought a game on sale for $6 less than half its original price.she paid $88 for the jacket. What was the original price
If five slices of pizza cost $5.50, how much do two slices cost? Ten slices? Half a slice ?
how to solve 0.01x+0.07y=0.22 and 0.03x-0.05y=0.14 by substitution
if the slope of a position versus time graph is downward what kind of motion produced the graph
walter buys a bus pass for 30$. everytime he rides the bus money is deducted from the value pass. he rode 12 times and 24$ was deducted from the pass. how much