raminajjar0 raminajjar0
  • 11-05-2020
  • English
contestada

If you want to give a vendor an incentive to complete work early, which type of contract would you use?


Respuesta :

leiraallen
leiraallen leiraallen
  • 16-05-2020

fixed price contract: The vendor will be paid a fixed payment regardless his time spending. Thus the vendor will try to complete work as soon as possible, then he can receive his payment/ incentive for completed work

Answer Link

Otras preguntas

Given f(x)=x^3+2x^2 and g(x)=3x^2-1,find the following and state their domains. a)f+g b)f-g c)fg d)f/g
Suppose that x and y are related by the equation 2x^2-y^2=5 and use implicit differentation to determine dy/dx.
Use the percent proportion to solve each problem Round to the nearest tenth 37 is what percent of 58? 30 is 75% of what number
A body of mass 40kg is accelerating at a rate of 9m/s² . What is the rate of change of linear momentum?
Slope intercept form of a line: slope is 2/5 and y intercept is (0,5)
What two measurements are needed to determine density?
why does a simple oscillating pendullum not produce a vibrating sound
a student performed an experiment by placing the de-shelled egg in a concentrated salt solution for five minutes .what changes did he observed in the egg? give
Most of Africa's economies are best described as primary, secondary, tertiary or quaternary?
If the total cost of x apples is b cents, what is a general formula for the cost, in cents,of y apples?