Mpope2986 Mpope2986
  • 03-02-2020
  • Computers and Technology
contestada

In the ____________________ approach, the project is initiated by upper-level managers who issue policy, procedures and processes, dictate the goals and expected outcomes, and determine accountability for each required action.

Respuesta :

tledet24
tledet24 tledet24
  • 03-02-2020

Answer:

top-Down

Explanation:

Answer Link

Otras preguntas

How do I do this chart
The length of a rectangle is 3 mm greater than the width. the area is 154 mm squared. find the length and the width.
Is the law always fair?
Somebody plz help me
You are carrying a firearm. before crossing a fence, the first thing you should do is:
if it is wednesday on the east side of the of the international date line, what day is it on the west side?
A general lack of nutrition and wasting occurring in the course of a chronic disease is known as:
Describe how variations in an atomic nucleus account for its physical properties
Why can evaporation be used to separate a mixture? Check all that apply. A: One or more components has a lower boiling point than the desired component. B: The
A compact disc has a diameter of 11.8 cm. What is the surface area of the disk in square centimeters? In square meters?