Sadeghshakeri97 Sadeghshakeri97
  • 02-12-2019
  • Mathematics
contestada

60% of the work is done in 17 minutes, 40% of the same work, when is done (in minutes)?

Respuesta :

bridgecostello bridgecostello
  • 02-12-2019

Answer:

It would be 11.333 minutes

Step-by-step explanation:

I solved this by setting up a cross multiplication.

60%/17 so then 40/x.

Then here cross multiplying. 60x=680. divide by 60 and x would = 11.33

Answer Link

Otras preguntas

which person is functioning as an activist? a. Gamila, who is cooking for her parents and grandparents b. Abdos, who enjoys listening to the latest songs in the
What was the typical result of Native American children being sent to a U.S. Government boarding school?
Which of the following pairs are the best examples of homologous structures?(a) bat wing and human hand(b) owl wing and hornet wing(c) porcupine quill and cact
Which leader was a member of the Kikuyu tribe? A. Mohammad Gandhi B: Marcus Garvey C: Jomo Kenyatta D: Kwame Nkrumah
How did president frankin d roosevelt increase the power of the presidency
Rational numbers can be ______ or _______
Which character in Anton Chekhov's story, "A Problem", can BEST be described as dynamic? A. the colonel B. Ivan Markovitch C. the colonel's wife D. the offi
Anyone have the answer???????????
when was the kingdom of Israel established
A parabola can be represented by the equation y2 = –x. What are the coordinates of the focus and the equation of the directrix?