lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

the government body responsible for interpreting the consititution is the
what is the point-slope form of the equation for the line with a slope of -2 that passes through the point (4,-6)​
JUAN ¡Hola, Linda! ¿Qué tal las clases? LINDA Bien. (1) (tomar) tres clases... química, biología y computación. Y tú, ¿cuántas clases (2) (tomar)? JUAN(3) (toma
What is the best way to prep for senior year of high school?
Complete the sentences with appropriate reflexive verbs.1. Quand on a sommeil, on ______ tôt. 2. Après chaque repas, mes enfants ________ les dents. 3. Quand
help please. i suck at math
Wiat number should be added to both sides of the equation to complete the square? X^2+x=11
Shoot dem answers ?<3
which statement would be included in a summary of the first paragraph of chapter I of Nature
Write an equation of the circle with center (-7, -4) and radius 6 .