heemythecreator heemythecreator
  • 11-11-2018
  • Mathematics
contestada

A person is working at a constant rate. If he produces 15 details in 8 hours, how long does he need to work to produce 18 details? Let t be the time he needs to produce 18 details. Please write equation!

Respuesta :

luckyme14
luckyme14 luckyme14
  • 11-11-2018
15=8
15÷3=5
Answer is 20
Answer Link

Otras preguntas

larantWater(sugar)Carbondioxide29. The energy released in this process was originally present in1) sunlight and then transferred to sugar2) sunlight and then tr
Find the sum or difference 8+(-5)
oranges cost $3.42 for 9 pounds at this rate how much would 12 pounds cost ?
The slope of the line whose equation is 2x + 5y + 1 = 0 is0-2750-1/5O5/2
Write the coordinates of the vertices after a transition 5 units right S= U= T=
The slope of the line whose equation is 2x + 5y + 1 = 0 is0-2750-1/5O5/2
find a, b and c. don’t be slow. show the equation and answer for all pls (:
In the relationship between number of towers and number of customers proportional? Explain
The slope of the line whose equation is 2x + 5y + 1 = 0 is0-2750-1/5O5/2
Indicate whether each ecosystem is SALTWATER, FRESHWATER or BOTH.A. Coral reefsB. EstuariesC. Rivers and streamsD. Open oceansE. Lakes and pondsF. Wetlands