JaymezMerfy1002 JaymezMerfy1002
  • 01-10-2018
  • Computers and Technology
contestada

Which term describes the complexity of a document

Respuesta :

narstarolor
narstarolor narstarolor
  • 06-11-2020

Answer:

Work breakdown structure (WbS)

Explanation:

A work-breakdown structure in project management and systems engineering, is a deliverable-oriented breakdown of a project into smaller components. A work breakdown structure is a key project deliverable that organizes the team's work into manageable sections, and also defines its complexity.

Please let me know if this helped

Answer Link

Otras preguntas

American football field measure of 100 yards between the end zone and are 53 1/3 yards wide. is the length of the diagonal across thid field more less than 100
Why is the study of black holes important?
ways that colonists protested british policies
Danica wants to arrange her model cars in rows with exactly 6 cars in each row. She now has 23 model cars. What is the smallest number of additional cars she mu
What type of macromolecule is made up of subunits that are called amino acids?
Why are there species instead of a continuum of various animals?
why does the bermuda triangle so dangerous?
most metals are not magnetic but iron is why?
Which sea borders both St. Petersburg and Kaliningrad?
An earthworm receives support and shape from its fluid-filled cavity. It has _____. an endoskeleton an exoskeleton a hydroskeleton no skeleton