kmalone3883 kmalone3883
  • 12-03-2024
  • Engineering
contestada

Using the PERT estimate, calculate the estimated duration of an activity given:
Optimistic Estimate = 21 days
Pessimistic Estimate = 110 days
Most Likely Estimate = 55 days
a) 62.5 days
b) 74 days
c) 65 days
d) 68.5 days

Respuesta :

Otras preguntas

Solve for W 3/4w +8 = 1/3w -7
what is the sum 1.3+-2.4 enter your answer as a decimal​
QUESTION 3 The specific heat capacity of aluminum is 0.22 cal/g °C. The specific heat capacity of water is 1.00 cal/g °C. If you heat a 100-gram aluminum pot co
PLEASE ANSWER ASAP!! IREADY QUESTION How has m ing the quilting group changed Jada's thoughts about her friends? A)Jada understands that being away from her fri
Change 43 out of 200 to a percentage
Given sin t= 2/5 and cos t>0, find cos t
Solve the equation, determine the amount of solutions, graph it, and check it. -2|x-1|-4=-10
Who does the water cycle work?​
If a = 4 units, b = 7 units, c = 8 units, d = 11 units, and e = 5 units, what is the volume of the composite figure?
PLZ HELP! WILL GIVE BRANLIEST! God's promise to _______________ that his descendants would inherit the land of Canaan is the origin of Judaism. Joseph Jaco