kwartakmanjan1563 kwartakmanjan1563
  • 12-01-2024
  • Business
contestada

The time an activity will take assuming very unfavorable conditions is referred to as:
A. Pessimistic time
B. Delay time
C. Total slack time
D. Optimistic time
E. Most likely time

Respuesta :

Otras preguntas

The length of a rectangle is 6 times longer than the width. The perimeter is 42. What is the width?
which of the following figure has reflectional symmetry? A. figure a B.figure b C.figure c D.figure d
What does Rauschenbusch urge Christians to do to alleviate poverty?
Why did American Indians occupy Alcatraz Island in 1969?
Which of the following is a correct equation for the line passing through the point (-1,4) and having slope m = -3?
What happens during the cytokinesis phase of meiosis?
A square has a side of 6.25 feet. what is the area in square feet? round to the correct significant digitsa square's area is just its side squared, so if we hav
I really please need help. Does anyone know these last 6 questions. Brainliest answer and 13 points
Explain the concept of reaction equilibrium and how the activities of enzymes depend on the temperature, ionic conditions, and pH of the surroundings.
I need to know how to convert 1250 feet per minute to miles per hour