ismailjallal2009 ismailjallal2009
  • 15-12-2022
  • Mathematics
contestada

cinco encuestadores, trabajando 8 horas diarias, completan los datos para un estudio de mercado en 27 días.¿cuanto tardarian en hacer el mismo trabajo 9 encuestadores trabajando 10 horas?

Respuesta :

Otras preguntas

What is 15 cm/year converted to inches per month? Round to the nearest tenth.
For another picnic, you want to make hamburgers with pickles, again without having any left over. You need to balance the number of packages of buns (which usua
In a 5V system if you were asked to take one input HIGH and another LOW what would you do (i.e. where would you connect them)?
in percent, the “whole” is 100. What is the “whole” in decimal form?
Solve the expression 7^P 2 (P = permutation) 42 2,640 120 5,040
Which of the following properties of water would be most important in protecting a fish in a shallow pond on a hot summer day
There are 135 people in a sport centre. 73 people use the gym. 59 people use the swimming pool. 31 people use the track. 19 people use the gym and the pool. 9 p
how to writte a business plan​
2/5 times 4/5 I need step by step explanation PLEASE HELP ASAP I’m crying cause I’m struggling so much
ke onda alv dame los answers