taejinkook
taejinkook taejinkook
  • 13-10-2022
  • Mathematics
contestada

two workers, the second worker starting work 1.5 days later than the first, would complete the scheduled work in 7 days. if each of them worked alone, the first worker would take 3 more days to do the work than the second. in how many days would each worker have finished the job working alone?​

Respuesta :

Otras preguntas

Five times the difference of a number and 8 is 45.
What effect does the following line have on the poem? the wheat waved and wilted under the wind a. It creates a sense of being stuck in a box. b. It imitates t
Which of these factors pulled immigrants to the united states
Solve. –30 = 6z a. –5 b. –6 c. –24 d. –180
the lithosphere is made up of the ____
The nation's largest railroad center was located in: Cincinnati Kansas City Chicago New York
The original Almohads and Almoravids were both a part of which group? a. Muslim reformers b. Bantu-speaking peoples c. Swahili peoples d. Arab peoples
Cars entering our field of vision from the side require the use of ___________. A. peripheral vision B. central vision C. both peripheral and central vision
Find 10.5 in plus 7.35 in and use the correct number of significant digits in the sum
8x-9y+16x+12y How do I solve this equation